Excavation and soil calculator

Work out how much dirt is coming out of the ground, how much bigger it gets once it is out, what it weighs, and how many trailer or truck loads that really is.

This free NZ excavation calculator turns a trench, pad or set of post holes into the numbers that matter: the volume in the ground, the bigger loose volume you actually have to cart (dug soil bulks up 10 to 50 percent), the tonnes, and the trailer or truck loads. It counts trailer loads by legal payload, not by how much fits, because soil runs out of weight long before it runs out of room. Below the tool: a plain guide to estimating, diggers versus shovels, and where the dirt can actually go.

WEB GRENADE · EXCAVATION ESTIMATOR

A site scrape for a slab, shed pad, deck or lawn. 150 to 300mm covers most topsoil strips.

If the posts get concreted in, nearly all of this spoil has to leave; the hole gets refilled with concrete, not dirt.

Fine-tune the assumptions

Trailer payloads default to published hire specs (Hireace: caged single-axle 680kg, tandem about 1,600kg); check the plate on yours. Truck bins vary by operator, so edit to match your cartage quote.

Loose soil to cart
7.8
from 5.76m³ in the ground · clay bulks about 35% when dug
In the ground (bank)5.76 m³
Weight (approx)10.4 t
Tandem trailer loads7
Disposal costenter a rate
Seven trailer runs, hooked up, loaded by hand, weighed in and tipped. Past about six loads, ring a cartage company: a 6-wheeler takes the lot in one hit.
Estimates for planning only. Bulking and density vary with moisture and compaction even within one site; the soil type sets a typical published figure. Loads are counted by legal payload. Sources listed below.
The plain guide
01

How to use this excavation calculator

Pick the shape of the dig, punch in your measurements, and everything updates as you type. Trench covers footings, drainage runs and cable trenches. Pad covers site scrapes: a slab, a shed base, a deck footprint, stripping tired lawn. Post holes does the round-hole maths for a fence or pole build, times however many holes you are drilling.

Then tell it your soil and how you plan to cart the spoil. The soil type sets two numbers at once: how much the dirt swells when dug, and what it weighs. Both change the answer more than most people expect, which is what the next section is about.

02

Why the hole makes more dirt than the hole

+35%how much dense clay grows when dug

Ground that has sat undisturbed for decades is packed tight. The moment a spade or a bucket breaks it out, air gets in between the lumps and the same dirt takes up more room. Earthworks people call it bulking, and they quote two volumes for every job: bank (measured in the ground) and loose (measured on the truck).

The swing depends on the soil. Published swell tables put clean sand and gravel around 14 percent, loam and topsoil around 20, dense clay around 35, and broken rocky ground anywhere up to 50 or more. So a tidy 3m³ trench in clay quietly becomes about 4m³ of spoil on the lawn. Skip that step and your skip, trailer plan and cleanfill budget are all a third short before you start.

03

Estimating like a pro instead of guessing

680kgtypical single-axle hire trailer payload

The amateur estimate is volume only: measure the hole, hire a trailer, get surprised. The pro estimate runs three numbers in a row, and this calculator does the same:

  • Bank volume: the hole itself. Length by width by depth, or the cylinder maths for holes.
  • Loose volume: bank times the bulking factor. This is the quantity you cart and pay disposal on.
  • Weight: bank volume times density. Clay runs around 1.8 tonnes per bank cubic metre, topsoil around 1.4, sand about 1.6, rocky ground 2 or more.

Weight is the one that bites, because a trailer fills by weight long before it looks full. A typical caged single-axle hire trailer is rated to about 680kg of load; that is roughly half a cubic metre of loose clay, sitting well below the cage rails. Heap it "full" and you are towing double the rating: illegal, uninsured if anything happens, and genuinely dangerous to stop. A tandem at about 1,600kg carries a touch over a cubic metre of clay. That is why this tool counts loads off the payload plate, not off the cage size.

04

When a digger beats shovels: the time maths

One cubic metre of clay is about 1.8 tonnes. Moved by hand that is 35 to 45 wheelbarrow trips, every one of them dug, lifted, wheeled and tipped, and in real clay a fit person is doing well to dig and shift one to two cubic metres in a day. Your trench above might read as a tidy weekend and actually be a week of your back.

A small hire excavator changes the equation completely: what costs a labourer a day costs the machine well under an hour, and it stockpiles the spoil exactly where the trailer backs up to. The rough rule: under about a cubic metre in soft ground, shovels are honest work. Past two or three cubic metres, or anything in clay or rocky ground, the digger hire pays for itself in your first sore morning. If you are digging for concrete next, our concrete calculator picks up where this one stops.

05

Where the dirt can actually go

Clean excavated soil goes to a cleanfill. The definition is stricter than the name suggests: cleanfills accept virgin natural material, meaning soil, clay and rock, plus inert material like brick or unreinforced concrete. They do not take green waste, stumps, treated timber offcuts, plasterboard, general rubbish, or anything from a site with a contamination history (old sheep dips, workshops, horticultural land). Charges are typically by the tonne or cubic metre and vary by region, so ring before you load.

Other honest options: a "clean fill wanted" listing (people genuinely want good soil for landscaping), keeping topsoil on site for garden beds because bought topsoil is not cheap, or a hired skip for small mixed loads, telling the skip company it is soil first, since many price dirt differently or refuse it. The expensive mistake is mixing: one load of clean soil with fence offcuts and a paint tin through it stops being cleanfill and starts being priced as general waste.

Sources: bulking/swell factors per published earthworks swell tables (compiled swell factor tables: clean sand and gravel ~14%, loam ~20%, dense clay ~35%, broken rock up to 50%+), material densities per the Caterpillar earthwork density tables, trailer payloads per Hireace published trailer specs (caged single-axle 680kg, tandem ~1,600kg), cleanfill definition per the MfE/WasteMINZ Technical Guidelines for Disposal to Land, services location via beforeUdig. Truck bin sizes vary by operator and are editable in the tool. Guide only.

Quick answers
How much bigger does soil get when you dig it up?

Between roughly 10 and 50 percent, depending on the soil. Undisturbed ground is compacted; digging fluffs it up with air. Clean sand swells about 14 percent, loam and topsoil around 20, dense clay about 35, and rocky ground can grow by half again. So a trench that measures 3 cubic metres in the ground becomes about 4 cubic metres on your lawn. This calculator applies the right factor for your soil type.

How many trailer loads is a cubic metre of soil?

More than you think, because the limit is weight, not space. A cubic metre of loose clay weighs around 1.3 tonnes, and a typical single-axle hire trailer legally carries about 680kg, so that one cubic metre is two trailer runs even though it would physically fit in one. A tandem trailer at about 1,600kg payload takes roughly 1.2 cubic metres of soil per legal run.

Where do I take excavated soil in NZ?

A cleanfill, if the soil is clean. Cleanfills accept virgin natural material: soil, clay and rock, plus inert material like unreinforced concrete and brick. They do not take green waste, treated timber, plaster, general rubbish, or soil from contaminated sites. Fees and rules vary by region, so ring first. For small volumes, some landscape yards also take clean soil.

Do I need to check for cables and pipes before digging?

Yes, every time, even for post holes. beforeUdig is a free national service: lodge an enquiry online and the utility companies send you plans of the cables and pipes under your dig site. A struck power cable can kill you, a struck fibre trunk can cost you tens of thousands, and neither cares that it was just a fence job. Allow a few working days for the plans.

Make this tool better

Blunt feedback welcome. It goes straight to the humans who built it.

While the trailer is at the tip

You can price a hole. Can your website price a job?

Get a free, instant teardown of your site. We tell you straight what is winning you work and what is burying it.